CUSTOMER ’REQUIREMENTS :
Raw material : Raw Rock Gold
Raw grade :1-7ppm
GOLD GRAVITY PROCESSING PLANT
This process is suitable for rock gold mineral ore. Firstly, big particle stone will be crushed into less than 15mm;
Secondly, crushed material will be transported into ball mill and ground; after grinding, fine particle will be classified in the spiral classifier, big particle will be screwed back into ball mill and ground again, until meet the requirement. Required particle will be pumped into gold concentrator for roughing process, after roughing process, we can get rough concentrate and tailings.
Rough concentrate will directly get into shaking table for concentrating process.
Finally we can get gold concentrate on the shaking table.
PROJECT: GOLD Ore CIP PLANT CUSTOMER ’REQUIREMENTS :
Raw material : Raw Rock Gold
Raw grade :1-7ppm
GOLD Ore CIP PLANT
CIP is cyanide gold extraction process. Firstly, raw material is crushed into less than 10mm by different types of crushers; secondary, crushed material will be ground and classified into 85% of 200mesh, then fine powder will get into thickener, after concentration, will add chemical and carbon in the tank. After leaching and absorption, get gold loaded carbon. Finally we can use electrolysis equipment and furnace to get gold bar.
ALLUVIAL GOLD PROCESSING PLANT
This process is suitable for Alluvial gold. For gold in soil and sand, the Nile prepares a solutions, in this solution, you can collect gold in centrifugal concentrator, shaking table, and carpet. The recovery rate is above 90% and it can help you get more gold than traditional ways. This solution only needs small amount of money, we have many types of product according to your needs.
Firstly, this solution uses gold trommel to select small materials with gold(like soil and sand).It can deal with many materials efficiently in one-time and save your cost on workers.
Secondly, through centrifugal concentrator materials will be separated again to get gold ores.
Finally by the selection of shaking table, chute and carpet, the selection comes to the end.
PROJECT INFORMATION
1) Raw materials: Alluvial gold
2) Capacity: 5-10tph
RECOMMEND MACHINE MODEL
GTS500X1910 Gold Wash Plant
Note: Included Motor, Voltage 380v 50hz or as your requirement.
No.1 Gold Wash Plant
Gold Wash Plant GTS500*1910
No. Model GTS500*1910
1 Screen Diameter (mm) 500mm
2 Screen Length (mm) 1910mm
3 Capacity (t/h) 5-10
4 Generator(hp) 5.5
5 Type Mobile type
No. Model GTS1200*2500
1 Screen size (mm) Φ1200*2500
2 Fixed sluice box (mm, L*W) 6000*1000
3 Capacity (t/h) 30
4 Generator(kw) 35
5 Type Mobile type
No.2 Mobile Gold Wash Plant
Mobile Gold Wash Plant GTS1200*2500
Part A: Overallinformation:
Clients mining
situations Mainly Alluvial gold, sandy nature soils, part clay, with gravels and rocks. Gold to be mainly coarse gold with part fine size gold.
Processing capacity 30 tons per hour for Alluvial gold.
Main parts Equipped with feeder hopper, heavy duty clay scrubber, heavy duty trommel screen, sluice box with gold carpet, etc.
The main working principle of our GTS1200X2500 Alluvial gold plant with sluices:
1. Clients use excavators for feeding the soils to the hopper, the grizzly will block out big size gravels, water sprays pipes inside the hopper will slurrify the soils;
2. Heavy duty clay scrubber with inner water spray and scrubbing teeth will break hard clay and wash off the minerals;
3. Heavy duty double sieve trommel screen with high-pressure water sprays for washing, screening and separating,
4. Inner sieve is 25mm steel bars, outer sieve is 10mm steel wire sieve;
4. +10mm gravels will be discharged as tailing at the end of trommel;
5. -10mm soils slurry will be directed to 2 sets of 6.0 meter long fixed sluice box with carpet for high recovery rate of gold;
6. Submersible slurry pump for supplying water to the whole wash plant, etc;
Part B: Technical Details:
I : Alluvial Gold Process Plant:
No. Items Parameters Remark Photos
1 Model TS1200X2500
Screen size (mm) Φ1200*2500
Processing capacity(t/h) 30TPH
Gold recovery type Fixed sluice box 2 sets
2 Feeding System Hopper 1 Set
Hopper plate 8mm
3 Screening System Scrubber Trommel 1 Set
Trommel screen Φ1200*2500 Double layer sieve
(mm, D*L) Water pipes on both sides
Inner sieve 25mm Steel bars
Outer sieve 10mm High-Mangan ese wire sieve
Drive type Motor driving chain and gear
4 Gold Recovery
System Fixed Sluice 2 Sets
Fixed sluice box (mm, L*W) 6000*1000 2 sets 5mm thick
Gold carpet (mm, L*W) 6000*1000 2 sets
5 Controlling System Control box 1 set
6 Power Supplying System Diesel generator 1 Set
7 Water Supplying System Submersible Slurry Pump 1 Set
Fresh water pump -For supplying water to
hopper
-For supplying water to clay
87 Mobile System Heavy duty Mining Type
Wheels 1 set
PAYMENT TERM
1. PAYMENT: 100% FULL PAYMENT BY EFT, TO BE PAID BEFORE GOODS LEAVE SELLER’S FACTORY.
2. PACKING: ALL THE GOODS ARE PACKED IN THE CONTAINER.
3. LOADING: IN THE NILE FACTORY.
4. DELIVERY TIME: GOODS FINISHED WITHIN 20 WORKING DAYS AFTER RECEIVING FULL PAYMENT.
5. WARRANTY: 100% BRAND NEW WHEN GOOD LEAVE THE FACTORY. THE
SELLER GUARANTEES QUALITY OF THE MACHINES(EXCLUDING TEAR & WEAR
PARTS) FOR A PERIOD OF ONE YEAR FROM THE DATE OF TRIAL RUN, BUT NOT
TO EXCEED 18 MONTHS FROM THE DATE MACHINES ARRIVE AT THE ARRIVAL PORT. IF ANY PARTS (EXCLUDING TEAR & WEAR PARTS) ARE FOUND
DEFECTIVE IN THE FIRST YEAR, THE SELLER SHOULD REPLACE FREE-OF-COST.
6. FOUNDATION BUILDING, EQUIPMENT INSTALLATION, AND
COMMISSIONING, WORKERS TRAINING: AFTER BOTH SIDES SIGN THE
CONTRACT, WE WILL PROVIDE PROJECT LAYOUT DRAWING, EQUIPMENT
INSTALLATION DRAWING, AND PROJECT FOUNDATION DRAWING TO OUR
CUSTOMERS. ACCORDING TO THE SITUATION OF ENGINEER OF OUR
CUSTOMERS, WE WILL SEND OUR ENGINEERS TO GUIDE FOUNDATION
BUILDING AND EQUIPMENT INSTALLATION AND COMMISSIONING. OUR
ENGINEERS ARE RESPONSIBLE FOR GUIDING OUR CUSTOMERS TO RIGHTLY
OPERATE MACHINES. AT THE SAME TIME, OUR CUSTOMER WILL PROVIDE BOARD AND LODGING, ALSO ROUND TRIP TICKET AND 120 USD FOR SENIOR ENGINEER EACH DAY.
6.OUR SERVICE:OUR COMPANY IS FAMOUS IN CHINA, AND WE ALREADY
OBTAINED ISO9000, BV, CE AND COC QUALITY CERTIFICATE. IN SOUTH AFRICA,
OUR PRODUCTS ALREADY SOLD TO UGANDA, SUDAN, ALGERIA, CAMEROON,
KENYA, MAURITIUS, MOROCCO, NIGERIA, ZAMBIA AND ALSO WE HAVE BRANCH
OFFICE IN SUDAN. IN ORDER TO HELP OUR CUSTOMERS CUSTOMS CLEARANCE,
WE CAN PROVIDE RELATIVE CERTIFICATE SUCH AS PVOC, COC, SONCAP AND
ETC.
EQUIPMENT PICTURE
WORKSHOP
EQUIPMENT PICTURES
QUALITY INSPECTION
(Each key detail of crusher is double checked by inspector in factory, to ensure the product reaches standard. )
MANUFACTURER PROCESS INSPECTION
INSPECTED BY THIRD PARTY(SGS OR BV)
PROCESSING EQUIPMENT ( It is necessary to have effective tools to do good work )
No Equipment Name Model Qty Remark
1 Vertical lathe DVT500×25/32 1 set Processing
2 Vertical lathe φ5 2 set Processing
3 Double column vertical lathe C5225E×25/12-4 2 set Processing
4 Vertical lathe CA5116EX10/5 1 set Processing
5 Planing machine 3×9m 2 set Processing
6 Planing machine BYE60100 2 set Processing
7 Boring mill PX6113/2 1 set Processing
8 Boring mill PX6111B 1 set Processing
9 Floor-type lathe φ4×15 1 set Shell processing
10 Gear hobbing machine φ5m 1 set Gear processing
11 Gear hobbing machine Y3135 2 set Gear processing
12 Travelling Crane 150T 1 set Crane
13 Travelling Crane 100T 2 set Crane
14 Travelling Crane 75T 3 set Crane
15 CNC cutting machine PKD-4000-18000 1 set Cutting steel plate
16 Plasma cutting machine LGK-100 1 set Cutting steel plate
17 Edge planer 15m 1 set Shell groove process
18 Plate rolling machine CDW11-35×3200 1 set Steel plate rolling
19 Plate rolling machine CDW11-80×3500 1 set Steel plate rolling
20 Automatic welding machine A6S 2 set Shell welding
21 Welding equipments 28 set Electric welding
22 Cupola furnace 5T/H 2 set Cast Iron
23 Cupola furnace 3T/H 2 set Cast Iron
24 Furnace 3T/H 2 set Cast steel
25 Heat treatment Furnace 2 set Heat treatment
AFTRE SALE SERVISE
(We do the survey for every client to ensure the client satisfacation, the below is the feedback from clients.)
INTERNATIONAL COOPERATION
SOLD TO ALL OVER THE WORLD
Magnetic And Gravity Separation Process
Client
800tpd Flotation Plant in Uganda
This product is imported therefore delivery lead time is 5 to 6 weeks.